Three Install Paths
Hi [First Name],
One of the first questions that comes up in almost every conversation is: who actually puts this thing together? I wanted to lay out your three options so you can see what each one looks like — and so you know there’s no pressure to decide right now.
Most people picture a multi-day construction project, but because everything arrives pre-cut with the joinery already done, the install is a lot faster than you’d expect. The right path really just depends on your schedule, whether you know a good contractor, and how hands-on you want to be.
Here’s how each one works:
Path 1
DIY
Great if you’re handy, you’ve got a few people who can help lift, and you like the idea of building it yourself.
What We Send You
Full plans, pre-cut joinery, all the hardware, a written assembly guide, and our phone number for when you get stuck.
What You’ll Need
Site prep, footings, a crew of two to four, and a weekend or two. Lifting equipment helps but isn’t required for smaller kits.
How Long It Takes
A day to a weekend, depending on size and your crew. The joinery is already cut — that’s the part that would normally slow you down.
About 10–15% of families go this route.
Path 2 · Most Common
Your Local Contractor
This is what most people do — especially if you already know a builder or handyman you trust.
What We Send You
Your contractor gets the same plans and hardware we’d hand our own crew. We answer their questions; they handle the labor.
What You’ll Need
A contractor (we’re happy to share vetting questions if you need help finding one), permit coordination, and site prep. We stay reachable the whole time.
How Long It Takes
Most contractors wrap up in a day. Bigger jobs may run a little longer, but it’s not the multi-week project people picture.
About 50–60% of families go this route — the most common by far.
Path 3
Our Install Crew
If you’d rather just have one number to call and let us handle it, this is your path.
What We Handle
We bring our crew to your site, coordinate the freight, do the install, and walk you through everything when it’s done.
What You’ll Need
Site prep readiness — we’ll walk you through it. Permits in hand before we arrive, plus power and water access on site.
How Long It Takes
Usually an afternoon to a full day. Bigger jobs can take a bit longer, but most go up a lot faster than people expect.
About 25–35% of families go this route.
Not Sure Yet? Start Here
A Few Quick Questions
Do you have the time, tools, and a few people who can help lift?
Yes → Path 1 might be your thing.
Do you already know a contractor — or want help finding one?
Yes → Path 2 is probably your fit.
Would you rather just hand it off and have one number to call?
Yes → That’s exactly what Path 3 is for.
If you have any questions about which path makes sense for your project, just reply to this or give us a call. We’re happy to talk it through.
Talk soon,
Laurence Bunker
President, Western Timber Frame
[Phone] | westerntimberframe.com
Western Timber Frame · 7,000+ structures shipped
2026 U.S. Small Business Administration
Utah Manufacturing Small Business of the Year

